Hydrogen cylinders contain pure hydrogen unless they are specifically manufactured for and marked as a mixture. The purity grade is usually between 99.5% and 99.9999%. The balance is typically inert gases (such as nitrogen) with just ppm levels of other contaminants, but this can vary depending upon the production source. When emptied, the residual is still the same purity of hydrogen, just at…

Category: Storage
Keywords: Storage, Cylinder

This production rate of hydrogen of about 96 kg/h is quite significant, which depending upon the application might require a significant amount of storage. There will be a need to determine how many kg the project wants to store from this production rate in order to determine how much hydrogen ground storage is needed. Since the project is in Europe, look for pressure vessel manufacturers that…

Category: Storage

These distances are based primarily on hydrogen piping releases and resultant vapor clouds and jet flames based on pipe diameter and pressure. It’s important to note that many facilities have issues such as confinement and congestion, so it may be applicable to apply contemporary engineering models to assess risk.

Category: Site Planning

There is technically no upper limit for GH2 storage listed within the separation distance tables within Chapter 7 of NFPA 2. For LH2, there is a 75000-gallon upper limit for the LH2 storage separation distance tables within Chapter 8 for LH2. 
It’s important to note that many facilities have site specific issues such as large quantities, confinement, and congestion, so it may be…

Category: Site Planning

The Global Asset Protection Services (GAPS) standard was written 20 years ago for property loss prevention at crowded chemical plants and is intended for existing and new oil and chemical facilities to limit explosion over-pressure and fire exposure damage; thus, the purpose is different than NFPA 2. NFPA distances were based on studies from the 1960s as well as qualitative factors that were…

Category: Site Planning

Previous versions of NFPA 55 listed overhead power lines within the separation distance tables with no voltage distinction. The separation distances were 15 ft for GH2 and 25 ft for LH2 for all overhead electrical lines. The current edition of NFPA 2 includes these in overhead utilities; the distance for GH2 and LH2 will vary with pressure and diameter of the hydrogen piping. In practice, high…

Category: Site Planning

This can be a complex problem and response to insulation failure should be considered in the emergency response guidelines and procedures. 
First, a tank with an insulation failure may boil off at an elevated rate which applicable codes build into the relief device and vent system design.
Second, ice and oxygen enriched liquefied air can form where inadequately insulated surfaces…

Category: Storage
Keywords: Storage, Oxygen, Leak, Safety, Tank

Each system should be evaluated for exposure of equipment to jet fires. The design team should develop
a plan to mitigate exposure as part of the hazard analysis. Fire barriers, walls, enclosures, and insulation
systems are frequently installed to meet code requirements where separation distances are not
sufficient or where the probability of exposure to a jet fire is high. Barriers…

Category: Site Planning
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts