The most common modes of failure for vent lines is backpressure and thrust forces.
Backpressure failures can be from several causes:

  • Inadequate calculation of the backpressure caused by the high flow rates. Vent system design pressure is often only designed for the maximum 10% backpressure that is required by ASME Code. However, it should be noted that the large flowrates from…
Category: System Design
Keywords: Pressure, Ventilation, Vent System, Installation

Vent systems are typically open to the atmosphere, so it’s easy to overlook that they must be designed to withstand significant internal pressure. The two primary sources of pressure within vent systems are: 1) backpressure from the flowing gas, and 2) internal deflagration/detonation.

The large flows of gas exiting relief devices and vents will create backpressure within the vent system…

Category: System Design
Keywords: Vent System, Deflagration, Detonation

Liquid hydrogen is rarely vented as a liquid. If liquid hydrogen is vented, there should be a means to ensure that it is fully vaporized. The vent systems for LH2 tanks are connected to the vapor space on the tanks to ensure in most instances, this occurs. Most vents from a liquid hydrogen system will vent gaseous hydrogen, but this gas, may still be as cold as -420 F. There are no code…

Category: Miscellaneous
Keywords: Temperature, LH2, Vent System, Liquid Hydrogen

Yes, for all stacks. GH2 has a minimum prescriptive height of 10 ft. There is no minimum prescriptive height for LH2. However, 25 ft has been a best practice for the industry for years. Vent stack outlets that orient the release vertically help reduce the radiation exposure at ground level. Care must be taken to consider varying weather conditions, particularly wind, as well as surrounding…

Category: System Design
Keywords: LH2, GH2, Flare, Vent Stack

Generally flaring is not recommended. Normally GH2 is not flared for most hydrogen equipment as the piping diameters are smaller. The largest stacks are the LH2 vent stacks on trailers and on tanks for the main safety valves are 3”. For GH2 systems the flare stacks are generally smaller in diameter. 

Flaring is a deliberate ignition of a hydrogen stream. If the hydrogen stream is to…

Category: System Design
Keywords: Venting, LH2, Flaring, Vent Stack

There are several levels of documents which can be used to assist with the design, sizing, selection, and installation of the pressure relief device settings for LH2 tanks. 

Pressure vessel design codes, such as the ASME Boiler and Pressure Vessel Code will provide minimum requirements for design of pressure vessels (including LH2 tanks), relief devices, and relief systems. However…

Category: Pressure Relief Devices
Keywords: Boiling Liquid Expanding Vapor Explosion (BLEVE), LH2, Fire, NFPA 2, Storage, Pressure Relief Device

At least three of the ASME B31 piping codes are logical choices:

  • ASME B31.1, Power Piping
  • ASME B31.3, Process Piping
  • ASME B31.12 Hydrogen Piping and Pipelines

Considerations for code selection include:

  • Requirements imposed by the authority having jurisdiction, whether by direct reference or…
Category: Piping
Keywords: Piping, Codes, Requirements

Safety codes globally have a requirement to provide a positive means to isolate energy sources and hazardous substances prior to performing maintenance. For gaseous hydrogen systems, methods such as a blind flange, a double block valve arrangement or a double block and bleed valve arrangement can provide that positive isolation.

Installing a blind flange requires breaking the supply line…

Category: Pressure Relief Devices
Keywords: Valves, Codes

The requirements of the code used for the original construction apply. The piping may meet the requirements of more than one code. In which case, the code used for changing the rating may be different than the original code of construction. In any case, the re-rated system should meet all of the requirements of the selected code. Note that if the original proof test of the system was…

Category: Piping
Keywords: Codes, Piping, Requirements

The code used for repair and alterations of an existing system depends on the code used for construction as well as on the requirements imposed by the jurisdiction. Note that getting a permit from the jurisdiction may be necessary for an extensive alteration.

Code of ConstructionGenerally Accepted Code for Repair and Alterations…
Category: Piping
Keywords: Piping, Codes
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts