Do not interconnect hydrogen drain trap lines with other drain lines
Thoroughly inspect equipment installation to manufacturer’s installation instructions
Warn against unauthorized field modifications
Consult the…
Hazard analysis should consider potential leak locations, potential ignition sources in the vicinity, and the potential for accumulating flammable gases in that area.
Users should leak-check all cylinders upon installation. This event…
Installation
After this accident, a safety inspection team was organized. An investigation of this incident and an inspection of all other experimental equipment was conducted by the team. As a result of this inspection, the heaters are now hard-wired to the…
First, it appears that the system may not have been vented properly. CGA G-5.5 should be used for determining safe locations based on the variables of the specific setup. Also, if the compressor was tied to a storage system, a backflow prevention…
Because of the near invisibility of a hydrogen flame in daylight and hydrogen's extremely low ignition coefficient, if a known leak is present (e.g., an audible hissing), ignition should always be presumed. The primary cause of this incident…
It is characteristic of silver/zinc batteries to outgas both hydrogen and oxygen for several hours after discharge. Also, in the future, the battery should be properly secured inside the container.
Normally hydrogen fires are not extinguished until the supply of hydrogen has been shut off due to the danger of re-ignition and explosion. During a gas leak/fire, it is important to shut off the source of the hydrogen if it is safe to do so. If…
Lessons Learned The site initiated the establishment of a field patrol and strengthened their onsite monitoring of mechanical equipment during a plant-wide temperature rise.
Key:
We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.