Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.
The investigation team concluded that hydrogen gas was released through a failed 19-inch diameter gasket and ignited under the roof of the compressor shed where it was partially confined. Some gas escaped from the shed prior to the explosion, but…
The ignition of the fireball could have been caused by any of the following mechanisms:
Based on the results of the company investigation and analysis of an amateur video, the company determined that the incident could have been caused by the failure of one of the following plant components:
· pipes leading to the reactor…
In addition to the probable causes listed above, the lack of a standard operating procedure for hydrogen leak detection was one of the probable causes of this incident. Additional contributing factors included the following:
- Severe pipe…
The incident was the result of a combination of factors leading to exceptional temperature conditions that were not taken into account in the mechanical design of the reactor. Corrective actions that were implemented by the plant management…
The following actions were proposed as a result of this incident:
Three root-causes were noted during the investigation: (1) the use of incompatible materials in the manufacturing of the PRD valve, (2) improper assembly resulting in over-torquing of the inner assembly, and (3) over-hardening of the inner…
An important aspect of the reliability of a valve is the condition of the stem seal which tends to deteriorate with time and wear. Valves used in hydrogen service should be packed with the correct valve packing material and periodically checked…
The researcher's failure to pull the fire alarm was an oversight of required facility practice. The alarm should have been triggered in consideration of the potential for greater harm to personnel and facilities.
Hot, reacting ammonia…
Maintain an internal process for verifying component wetted material compatibility for intended use as part of the procurement process for hydrogen system equipment. It is critical that component parts be appropriately rated for the materials,…