LESSONS LEARNED:

  1. Compressed gas cylinder caps can be very difficult to open as rust often occurs in the threads.
  2. There are wrenches specifically designed to remove…

1. Management must ensure that operating decisions are not based primarily on cost and production. Performance goals and operating risks must be effectively communicated to all employees. Facility management must set safe, achievable operating…

  1. Inadequate Safeguards - The system was designed with low-point drains to facilitate water removal, however, these were found to be inadequate in both location and size. The fact that the mixed feed pre-heat coil was not self-draining was…

In the future, refining, petrochemical, and chemical industries need to review material verification programs to ensure that the maintenance procedures include sufficient controls and positive material identification (PMI) testing to prevent…

  • Attentiveness to proper procedure would have prevented this incident.
  • This incident also underscores is the need for rigorous training on hydrogen properties and behavior, not only for the operators of fueling equipment but also for…

This incident led to several changes in procedure:

  • The purity of any gas bottle connected is double-checked. The practice outlined in the SOP requires confirming the content of the cylinder via the cylinder label prior to…

Incident investigation findings for corrective actions were:
1. Install a valve after the regulator as an added precaution.
2. Clean the coupler at the end of the hydrogen delivery tube after each use to ensure that any catalyst residue…

Follow CGA G-5.5 vent end system designs.

Several recommendations were outlined by the investigating committee to govern future operations of the hydrogen compressor in the synthetic liquid fuels laboratory:

  1. Install a cutoff that will shut down the compressor when the…
  1. Consider periodic testing of breakaway device.
  2. Consider determining shear force limit of vehicle receptacle adapter fittings.

Mechanical pressure gauges tend to be imprecise if only used in a narrow portion of the full scale. Digital transducers, although slightly more expensive, offer much more precision. The event happened because the set pressure was only 10% of full…

This occurrence points to the importance of gathering and organizing all applicable administrative controls and other commitments prior to commencing work. It also re-emphasizes the importance of attention to detail, not only by the person…

Follow-up investigation of this occurrence confirms that it was inadvertent. Attention to detail while performing any task is a must for all personnel. This is to insure the safety of both the individual performing the task and others that may…

Personnel should be aware that items requiring special receiving inspections should still be verified/examined by the end user prior to use.

Given that the anaerobic chamber and associated nearby electrical equipment were not designed or…

Implementing and enforcing the laboratory's stop work and restart policy and procedures in conjunction with peer reviews for new processes and experiments should help prevent future accidents due to a lack of recognition of potential reactions…

  1. Test safety system components even if they are new.
  2. Do not rely on listening for valve movement as confirmation that a valve is closing; measure downstream pressure to determine if the valve is really sealing properly.
  • A SOP should be developed which prohibits drivers from backing into the fill position.
  • As a precautionary measure to mitigate similar events in the future, piping barriers should be installed which protect critical H2
  • When truck drivers are carrying new trailers, with new load distribution characteristics, they need to exercise caution, especially on hazardous roadways such as the one described in this occurrence. If the trailer stack would have been…

Extra caution should be taken working around elevated pressure or low-temperature fluids and storage. Values should be checked and then verified by a second party, if possible.

After the aforementioned incident, a rigid cage was designed to protect the reactor from external conditions, and to protect the contents of the hood and any experimenter from the reactor, in the event of a pressure burst from the reactor cell.…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.

Contact info

We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.

Recent Posts